Slant_fin V-33 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Chaudière à eau Slant_fin V-33. Slant/Fin V-33 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
HOT WATER MODELS V-33 THROUGH V-180
INSTALLATION AND OPERATING INSTRUCTIONS
GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P. PROPANE GASES
CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE
Ratings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . .2
Installation Requirements:
Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Boiler Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Minimum Clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Venting Requirements . . . . . . . . . . . . . . . . . . . . . . . . . .3
Chimney and Type “B” Venting . . . . . . . . . . . . . . . . . . .4
Horizontal Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Vertical Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Regular Inspection . . . . . . . . . . . . . . . . . . . . . . . . . .6
Gas Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Electrical Controls and Wiring . . . . . . . . . . . . . . . . .11
Boiler Room Air Supply and Ventilation . . . . . . . . . . . .11
Water Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
Operating Instructions:
Filling and Venting Water Systems . . . . . . . . . . . . . . . .12
Initial Start, Safety and Lighting Instructions . . . . . . . .12
IID System with Honeywell VR8204 or VR8304 . . .12
Bur
ner Adjustment, Checking Gas Input . . . . . . . . . . .13
Care and Maintenance:
General Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . .14
Water Level Check . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Annual Inspection and Cleaning . . . . . . . . . . . . . . .14
Safety Check for Control Systems . . . . . . . . . . . . . . . .15
Protection from Freezing . . . . . . . . . . . . . . . . . . . . .15
W
ater Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
Appendix A and B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Sequence of Oper
ations . . . . . . . . . . . . . . . . . . . . . . . . . .
17
Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Pump or Valve Zoning of Water Boilers . . . . . . . . . . . . . .18
General T
roub
leshooting Guide
. . . . . . . . . . . . . . . . . . . . .
19
Piping a Heating-Cooling System . . . . . . . . . . . . . . . . . . .20
Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
IMPORTANT
READ ALL OF THE FOLLOWING
WARNINGS AND STATEMENTS
BEFORE READING THE
INST
ALLATION INSTRUCTIONS
WARNING
LIQUEFIED PETROLEUM (L.P.)
PROPANE FIRED GAS BOILERS
Installation location ONLY as permitted in paragraph
entitled "LIQUEFIED PETROLEUM (L.P.) PROPANE
GAS FIRED BOILER LOCATION" on page 3 of this
instruction book.
The above warning does not apply to
NATURAL gas
fired boilers.
The installation must conform to the requirements of
the authority having jurisdiction or, in the absence of
such requirements, to the National Fuel Gas Code,
ANSI Z223.1-latest edition. The installation must also
conform to the additional requirements in this Slant/Fin
Instruction Book.
In addition where required by the authority having juris-
diction, the installation m
ust conform to American Soci-
ety of Mechanical Engineers Safety Code f
or
Controls and Safety De
vices f
or Automatically Fired
Boilers
.
No. CSD-1.
W
ARNING
This boiler
, gas piping and accessor
ies must be
installed, connected, ser
viced and repaired by a
trained, experienced service technician, familiar with all
precautions required f
or gas fired equipment and
licensed or otherwise qualified, in compliance with the
author
ity having jurisdiction.
This man
ual must be left with owner and should be
hung on or adjacent to the boiler f
or reference
.
Printed in U.S.A. 301 Publication No.V-40
P
art No. 44-0596 Rev. M
Victory
Vue de la page 0
1 2 3 4 5 6 ... 19 20

Résumé du contenu

Page 1 - IMPORTANT

HOT WATER MODELS V-33 THROUGH V-180INSTALLATION AND OPERATING INSTRUCTIONSGAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P. PROPANE GASESCONTENTS . .

Page 2

10VICTORYFigure 9. Vertical Venting (3 IN.): All Victory ModelsAll items shown below are REQUIRED. All vent joints must be LIQUID and PRESSURE TIGHT.

Page 3 - VICTORY 3

VICTORY 11at test pressures equal to or less than 1/2 PSIG.D. All gas piping used should be inspected thoroughly forcleanliness before makeup. A sedim

Page 4

12VICTORYB. PUMP LOCATION-Locating low-head pump(s) onreturn to boiler is acceptable for smaller boiler sizes inresidences of one or two stories. The

Page 5 - VICTORY 5

VICTORY 138. Turn on all electric power to the appliance.9. Set thermostat to desired setting.10. If the appliance will not operate, follow the instru

Page 6 - 6 VICTORY

14VICTORY2. Safety Shutdown Checkouta. For proper operation the pilot should engulf thethermocouple, powerpile generator or flame sen-sor as shown bel

Page 7 - VICTORY 7

VICTORY 15burners as described on page 13.*To clean burners run a clean flue brush up the tubeuntil all foreign matter is removed.IV. SAFETY CHECK FOR

Page 8

16VICTORYAPPENDIX ARemoval Of Existing Boiler From Common Vent System"At the time of removal of an existing boiler, the followingsteps shall be f

Page 9

VICTORY 17Sequence of Operations Wiring DiagramsCAUTION: Label all wires prior to disconnection when servicing controls.Wiring errors can cause improp

Page 10

18VICTORYPUMP OR VALVE ZONING OF WATER BOILERSCOMBINATION CONTROLS WITH T TV Z TERMINALS*Pump Zoning system using R845 Relay.One R-845A nee

Page 11 - VICTORY 1

VICTORY 19BURNERS FAIL TO OPERATECAUSE1. Safety pilot out, or flame too low.2. Gas supply valve shut off.3. Electric switch open.4. Blown or defective

Page 12 - Figure 11

2 VICTORYDimensions (inches)Figure 1. Left End ViewFigure 2. Front ViewFigure 3. Right End ViewNOTE: Height Dimension increases to 30-3/16" and d

Page 13

20 VICTORYPIPING A HEATING - COOLING SYSTEM TO A WATERBOILER AND CHILLERFigure below illustrates a method of piping a heating-coolingsystem to a wate

Page 14

VICTORY 3INSTALLATION REQUIREMENTSThe installation must conform to the requirements of theauthority having jurisdiction or, in the absence of suchrequ

Page 15

4 VICTORYReference Table No. *ApplianceConnector Requirements*(ANSI Z223.1)Victory Boilers Type “B” See table 11-1 for minimum and maximum of vent 11-

Page 16

VICTORY 5HORIZONTAL PRESSURE VENTINGAll VICTORY models are certified for horizontal pressureventing with the following restrictions:1. Vent MaterialA.

Page 17

Model/Vent SizeV-90, V-120, V-150 and V-180 boilers may be vented into achimney (see “Chimney and type “B” venting” paragraph onpage 4) or into a type

Page 18

VICTORY 7Figure 6b. Venting with “B” vent or metal-lined chimney for V-90, V-120, V-150 and V-180 onlyMinimum vent connectors diameter is 5 inches. It

Page 19

8 VICTORYFigure 7. Horizontal Venting (3 IN.): All Victory ModelsAll items shown below are REQUIRED. All vent joints must be LIQUID and PRESSURE TIGHT

Page 20

VICTORY9Figure 8. Horizontal Venting (3 IN.): All Victory ModelsAll items shown below are REQUIRED. All vent joints must be LIQUID and PRESSURE TIGHT

Modèles reliés V-180

Commentaires sur ces manuels

Pas de commentaire